PASIR PUTEH: About 70 percent of the construction work at Section 1 and 2 of the East Coast Rail Line (ECRL), covering 82km from Tunjong, here, to Setiu, in Terengganu, was affected by the floods that occurred last week. Read full story
PASIR PUTEH: About 70 percent of the construction work at Section 1 and 2 of the East Coast Rail Line (ECRL), covering 82km from Tunjong, here, to Setiu, in Terengganu, was affected by the floods that occurred last week. Read full story