JOHOR BARU: The RTS Link Johor Bahru-Singapore project has entered a critical phase on Saturday (Nov 15) as Train Set 02 became the first to be successfully positioned at the Wadi Hana Depot, for testing and commissioning. Read full story
JOHOR BARU: The RTS Link Johor Bahru-Singapore project has entered a critical phase on Saturday (Nov 15) as Train Set 02 became the first to be successfully positioned at the Wadi Hana Depot, for testing and commissioning. Read full story